Clarity LIMS
Illumina Connected Software
Clarity LIMS v6.3 & Lablink v2.5
Clarity LIMS v6.3 & Lablink v2.5
  • Release Notes Clarity LIMS v6.3
    • Release Notes Clarity LIMS v6.3.1
    • Release Notes Clarity LIMS v6.3.0
  • Technical Overview
    • Technical Requirements
  • Installation
    • Installation Procedure
    • Guide to Secret Management
    • Install/Upgrade Secret Management for Integration Modules
    • Change the Clarity LIMS Hostname
    • Update Server Passwords and Database Connection Details
  • On-Premise Deployments
    • Pre-installation Requirements
      • Install a Purchased SSL/TLS Certificate
      • Configure Your HashiCorp Vault
    • On Premise to On Premise Upgrade Procedures
    • On Premise to On Premise In-place Upgrade Procedures
    • On Premise to Hosted Upgrade Procedures
    • Hosted to On Premise Upgrade Procedures
  • Administration
    • Database Cleanup Procedure
    • Backup and Restore Procedure
    • Receiving and Decrypting Cloud Backup Data
    • LDAP Integration
      • Using the LDAP Checker Tool
    • Illumina Connected Software Platform Integration
    • Clarity LIMS Log Files
    • Customize the Term Used for Projects
    • Enforcing Unique Sample Names Within a Project
    • Container Name Uniqueness
    • Configure Electronic Signatures
    • Creating Enrypted Passwords
    • Config Slicer Tool
      • Managing Configurations with Config Slicer
      • Upgrading a configuration package/manifest file for compatibility with Config Slicer v3.0.x
      • Config Slicer Use Cases
      • Troubleshooting Config Slicer
    • Audit Trail
      • Enabling, Validating and Disabling Audit Trail
    • System Settings
    • Automation Worker Nodes
      • Troubleshooting Automation Worker
  • Clarity LIMS v6.3 Reference Guide
    • Dashboards
      • Overview Dashboard
      • Projects Dashboard
    • Projects and Samples
      • Projects
      • Samples Accessioning
        • Sample List for Batch Import
        • Guidelines and Tips for Batch Sample Import
      • Assign and Process Samples
    • Lab View
      • Requeue and Rework Samples
      • Storing Sample Aliquots for Later Use
      • Modifying Completed Step Details
      • Alert Notifications
    • Configuration
      • Lab Work
        • Steps and Master Steps
          • Step Milestones
          • Derived Sample Naming Convention Tokens
        • Protocols
        • Workflows
      • Consumables
        • Reagents
          • Reagent Kit Lot Manifest for Batch Import
        • Controls
        • Instruments
        • Labels
        • Containers
      • Custom Fields
      • User Management
        • Manage User Access
        • User Roles
        • Configured Role-Based Permissions
        • User and Profile Page
      • Automations
        • Automation Trigger Configuration
        • Copy Custom Fields from Step Input to Output
        • Template Files Associated With Automations
    • Automated Quality Control
      • Configure a QC System
    • Search
      • Basic Search
      • Advanced Search
    • Genealogy View
    • System Performance
      • Queue Performance and Usability
      • Demultiplexing API Endpoint Performance
    • Terms and Definitions
  • LabLink v2.5 Reference Guide
    • Project
      • Email Notifications for Notes
    • Resource Materials & Contact Us
    • Users
    • Configuration
    • Publishing Files and Progress
Powered by GitBook
On this page

Was this helpful?

Export as PDF
  1. Administration

Database Cleanup Procedure

This section describes the steps for removing projects, samples, workflows, protocols, steps, and other artifacts that were created during training but are not needed for production, from the system.

After initial user training, but before the lab starts to use Clarity LIMS in production, a database cleanup is recommended.

This process removes any projects, samples, workflows, protocols, steps, and other artifacts from the system that were created during training but are not needed for production.

Contact the Clarity LIMS Support team to schedule a time for this cleanup procedure.

Preparation

In preparation for the clean-up, complete the following steps:

  • Delete all unwanted custom fields and master steps.

  • Set the status of all unwanted workflows to Archived. If there is an Archived workflow that you would like to keep, temporarily set its status to Active. Note the following:

    • Protocols that are part of an Archived workflow, or set of Archived workflows will be deleted.

    • Protocols that belong to an Active or Pending workflow, in addition to an Archived workflow, will not be deleted.

After these steps are completed, a Illumina Technical Support helps to perform the cleanup procedure. This procedure takes approximately 15–20 minutes to complete.

PreviousAdministrationNextBackup and Restore Procedure

Last updated 9 months ago

Was this helpful?